Change of traffic organization within Kolejowa Street
07 July 2023, Author: M.S./ (MK)
In connection with the next stage of work carried out under the reconstruction of the railway line "Rail Baltica" will be made changes in traffic organization and in the functioning of public transport.
The contractor informed that it is planned from July 11 (Tuesday) a part of Kolejowa Street will be excluded from traffic on the section from the intersection with railway line 219 (Szyba Zachód) to Sielska Street. The street will be closed for use for both vehicle drivers and cyclists and pedestrians.
Newly built detour for passenger cars and public transport buses going in the direction of Mrozy Wielkie will be led through the streets: Grajewska > Norwida > Skóra > temporary detour > Sielska > Kolejowa.
Trucks to Mrozy Wielkie will take a detour through Nowa Wieś Ełka > Prostki > Wiśniewo Ełckie > Regielnica.
Pedestrians walking in the direction of Wczasowy os. will be able to use a temporary crossing located behind the level crossing line 219 (Szyba Zachód).
Residents of the Sosnowa housing estate and buildings at ul. Kolejowa 27 and 29 will be able to use a temporary crossing and passage after the intersection with railway line 219 (Szyba Zachód) connecting with ul. Szyszkowa.
The route of bus line no. 1
Buses no. 1 (direction Mrozy) coming from Kilińskiego Street turn into Norwida Street, then into Skóra Street, a temporary detour from which will return to their current route (Sielska Street).
On the route you will be:
- running additional stop located near the building at 25a Kolejowa Street,
- decommissioned stop - Kolejowa 26.
Buses line no. 1 (direction Zakłady Mięsne) going Sielska Street will take a temporary detour, Skóra Street, Norwida Street from where they will return to the current route (Kilinskiego Street).
On the route you will be:
- running additional stop located near the building at 25a Kolejowa Street,
- decommissioned stop - Kolejowa 25 and skipped stop - Grajewska 01.
The change in traffic organization will last until December 15, 2023.
- News »
- Events happening in Ełk »
- Education »
- Civil Protection and Civil Protection »
- Videos from the series Safe Elk »
- Videos of the series happens in ełk »
- Physical Culture Development Fund »
- Innovative FUA Ełk - FEWiM strategic project 2021-2027 »
- Investments »
- Invest - aktualności »
- Invest - projekty inwestycyjne »
- Invest - slider »
- Invest - tereny inwestycyjne »
- About Coronavirus »
- Culture »
- In memory »
- White Lily Award Winners »
- NATO in Masuria »
- Awards and distinctions for Ełk »
- Awards and scholarships »
- Deliberations of the Elk City Council »
- Ngos »
- Aid to Ukraine »
- Improving the energy efficiency of buildings »
- Clean Air Priority Programme »
- Government Local Government Roads Fund »
- Government Local Investment Fund »
- Government Program for the Reconstruction of Monuments »
- Revitalization »
- Entertainment »
- Anniversaries and celebrations »
- Sport »
- Obstructification and changes in traffic organisation »
- Obstructification and change of traffic organisation »
- International cooperation »
- Adopt an Ełk dog »
- Tasks carried out from the state budget or from state special purpose funds »
- Green transport »
- Integrated Territorial Investments of the Ełk FUA »






