News

Author: PSK/ MK | Publish date: 13 May 2024

Partial repairs of streets with bituminous surface

13 May 2024, Author: PSK/ MK

Partial renovations of Ełk streets are starting. The works will be carried out on Wojska Polskiego, Armii Krajowej and St. M. M. Kolbe Streets. The scope of works includes m.in. restoration of bituminous surface and adjustment of manholes and gullies Street.

From 14 May, it is planned to start partial repairs of roads municipal buildings with a bituminous surface in the city.

The scope of work includes milling and then reconstruction of the bituminous concrete surface and regulation of sewer wells and street inlets.

Provided Performing works in individual locations of the city:

- Wojska Street Polskiego Street (intersection with Kościuszki Street to Kąpielowa Street),

- A. Krajowej Street (on the height of the art school building).

- St. M. M. Kolbe Street (intersection with Baranki Street to building No. 3a).

The contractor of the works is Przedsiębiorstwo Robót Drogowych Sp. z o.o. Oo.

Amount provided for the entire task according to the contract: 589 zł571.47

Please pay attention to the current marking of advancing works.